BARGE DEGASSING
April 26, 2015
FLARE-UNIT SUBSTITUTE
April 26, 2015

Our truck-mounted system is deployed on a 4-wheel drive 12-foot truck for maneuverability in hard to reach areas where pipelines are often located. We have the only system that easily navigates difficult offroad access points.